Case Study
Projects
-
-
Case Study
Plymouth Chargepoint Location Study
Strategic advice to increase the uptake of EVs
-
Case Study
Gas Vehicle Hub
-
Case Study
Bristol Chargepoint Infrastructure Study
-
Case Study
Low Carbon Truck Trial
-
Case Study
EV-Lite
Optimising electric vehicle battery production
-
Case Study
Camden Vehicle Trial
-
Case Study
Autonomous and Connected vehicles for CleaneR Air (ACCRA)
Autonomous and Connected vehicles for CleaneR Air
-
Case Study
Environment Agency: Low Carbon Fleet Strategy
-
Case Study
Coca Cola Heavy Goods Vehicle Trial
-
Case Study
British Gas Fleet Review
EV deployment risk assessment
-
Case Study
Plugged-In Midlands
Develop a regional network of EV chargepoints